AEP & Ground Water (well) Registration

Now deep into the registration process – the application was made almost 3 years ago – we are finalizing the process.  AEP wanted an updated Q20 – consisting of 48 hours of pumping and 48 hours of recovery.

“A 48-hour pumping test was conducted on Chinook Ridge’s supply well (GIC ID 2090656) from September 15 – 19, 2020 by personnel from Wild Rose Water Wells. Water levels were measured in Chinook Ridge’s supply well, two observation wells on Chinook Ridge property, one well on Jim Davies’ property and one well on Karen Singer’s property.”

The results were that the Singer well is not connected to the Chinook Ridge well.  The Davies well may or may not be connected as the pump test results showed no correlation in drawdown.  The full report can be viewed under the ‘2020 Water Rpt‘ tab on this website.

Substituting in the above values a 20-year safe yield (020) of 135.4 m3/day (20.6 imperial gallons per minute or 49,455 m3/year) is calculated. The analysis indicates the well is capable of supplying water at a rate of 20.6 igpm, which is greater than the tested rate of 12.0 igpm. The safe yield for the well is nearly double the license application volume of 26,982 m3/year, allowing for potential growth in water demand at a later date.